ISO 9001
Section
|
Ref
|
ISO9001:2008
Change
|
|
0.1 |
Para 1 |
The influences on the
design and implementation of an organisation’s quality management
system are redefined and listed including environmental
considerations and risk. |
|
Para 4 |
Statement of where and
who can use the standard now includes statutory requirements as well
as customer and regulatory and clarifies that these requirements are
restricted to those applicable to the product |
|
0.2 |
Para 2&3 |
Minor clarifications and
process definitions |
|
0.3
|
|
Changed description of
the relationship between ISO9001 and ISO9004. Continue to
complement each other. |
|
Notes |
New note stating ISO9004
under revision |
|
0.4
|
Para 1 |
A comment has been added
that the development of ISO 9001:2008 made due consideration to ISO
14001:2004, and reference to Annex A for correspondence between the
standards. |
|
1.1
|
Bullets a) & b) |
Again, statutory
requirements have been added (as in 0.1) |
|
Notes |
Note 1 has been amended
to include comments regarding purchased product as well as product
from realisation processes.
Note 2 has been added explaining that statutory and regulatory
requirements may be expressed as legal requirements |
|
1.2 |
Para 3 |
Again, statutory
requirements have been added (as in 0.1) |
|
2
|
Para 1 |
Amended to emphasise use
of referenced documents |
|
|
Para 2 |
The reference to ISO
9000 now states the fact that is at version 2005 |
|
3
|
Paras 2&3 |
The explanation of who
the ‘customer’, ‘organisation’ and ‘supplier’ are, has been removed
|
|
4.1
|
Bullets |
a) The word ‘identify’
has been replaced with ‘determine’
e) Where applicable has been added to measure |
|
Para 4
« |
The statement regarding
outsourced processes has been slightly re-worded and emphasises that
the outsourced controls shall be defined in the quality
management system.
This is a new ‘shall’ |
|
Notes |
Note 1 ‘analysis and
improvement ‘ added to list of process inclusions
Note 2 has been added giving a definition of an outsourced process
Note 3 expands on the type of control that may be applied to
outsourced processes in order to ensure control over them including
a link to clause 7.4 Purchasing |
|
4.2.1
|
c) & d) |
The wording has been
slightly re-modelled but the intent stays the same.
The requirements for records previously in bullet e) have been
incorporated in to bullets c) and d). |
|
Notes |
Note 1 has been added to
clarify that a single document may include the requirements for one
or more procedures. A requirement for a documented procedure may be
covered by more than one document. |
|
4.2.3
|
f) |
Clarification that the
external documents referred to are those needed for use in the QMS
|
|
4.2.4
|
|
Restructured to three
paragraphs but contain the same requirements.
The ‘shall’ requirement for control emphasised. |
|
5.5.2
|
Para 1 |
The requirement that the
management representative needs to be a member of the organisation’s
management has been added |
|
Notes |
Word change from
‘liaison’ to ‘liaising’. |
|
6.2.1 |
Para 1 |
Change in wording to
replace ‘product quality’ with ‘conformity to product requirements’. |
|
Notes |
New note added
concerning the effects of direct or indirect personnel on conformity |
|
6.2.2
|
Title |
Change in title to
‘Competence, training and awareness’ but keeps same words (change in
their order) |
|
a) |
Where the current
version mentions ‘… affecting product quality’, it now states ‘…
affecting conformity to product requirements’. |
|
b) |
b) now states that
‘where applicable’ training needs to be provided ‘to achieve the
necessary competence’ |
|
6.3
|
c) |
now includes information
systems |
|
6.4
|
Notes |
New note added to
clarify what work environment includes and gives some examples such
as noise, temperature, humidity |
|
7.1
|
b) |
Slightly re-worded |
|
|
c) |
The word ‘measurement’
has been added to list |
|
7.2.1
|
c) |
The word ‘related’ has
changed to ‘applicable’ |
|
d) |
The word ‘determined’
has changed to ‘considered necessary’ |
|
Notes |
New note added to
explain what the phrase ‘post delivery activities’ may include i.e.
warranty provisions, etc |
|
7.3.1
|
Notes |
New note added to
explain that design review, verification and validation are separate
activities though they may be performed separately or in any
combination e.g. verification and validation may be performed
together |
|
7.3.2
|
Para 2 |
‘These’ inputs becomes
‘the’ inputs (last para) |
|
7.3.3
|
Para 1 |
The words ‘provided in a
form that enables’ have been replaced by ‘in a form suitable for’. |
|
b) |
the word ‘for’ (service
provision) has been removed |
|
Notes |
New note added regarding
the inclusion of preservation of product |
|
7.5.1
|
d) |
‘measuring devices’ has
been replaced by ‘measuring equipment’ |
|
f) |
‘release’ has been
replaced by ‘product release’. |
|
7.5.2 |
Para 1 |
Sentences combined with
the removal of ‘ This includes any processes where’ and the
inclusion of’ and, as a consequence of’ |
|
7.5.3
|
Para 2 |
An added requirement to
clarify that inspection and test status must be identified
‘throughout product realisation’ |
|
Para 3 |
Slight re-wording of
record requirement under traceability |
|
7.5.4
|
Para 1 |
Re-wording of the
requirement to inform the customer if there is a problem and keep
records |
|
Notes |
The phrase ‘and personal
data’ has been added to the note about intellectual property |
|
7.5.5
|
Para 1 |
Re-wording and changed
placement of ‘conformity of’ to ‘in order to maintain conformity to
requirements’
‘This’ has changed to ‘As applicable’ (sentence 2) |
|
7.6
|
Title |
Title change from
‘measuring devices’ to ‘measuring equipment’ |
|
Para 1 |
Change from ‘measuring
devices’ to ‘measuring equipment’ and the reference to 7.2.1 has
been removed |
|
a) |
Addition of ‘or both’
after verified |
|
c) |
Complete reword but no
change. |
|
Para 4&5 |
Last sentence of
paragraph 4 made in to separate paragraph without change. |
|
Notes |
Original note removed
and replaced by note to explain about the verification and
configuration management of computer software (where it is used to
monitor and measure |
|
8.1 |
a) |
'of the product'
replaced with 'to product requirements' |
|
8.2.1
|
Notes |
A Note has been added to
provide some ideas as to how customer satisfaction can be measured
|
|
8.2.2
|
Para 2 |
‘This’ added for the
selection of auditors. |
|
Para 3 |
The requirement for a
documented procedure has been re-worded but remains unchanged |
|
Para 4 |
New paragraph. Taken the
records requirements for paragraph 3 and given separate emphasis. |
|
Para 5 |
A requirement for
management responsible for the area audited to ensure that
‘necessary corrections and corrective actions’ has been added
|
|
Notes |
Note that makes
reference to ISO 19011 |
|
8.2.3
|
Para 1 |
The phrase ‘to ensure
conformity of the product’ has been removed |
|
Notes |
A Note has been added to
explain that the organisation should consider the type of monitoring
and measuring of processes and the extent to which they affect
quality and the QMS |
|
8.2.4
|
Para 1 |
The requirement to
‘maintain evidence of conformity with acceptance criteria’ has moved
but is still a requirement |
|
Paras 2&3 |
Evidence of conformity
moved to paragraph 1.
Clarification of the fact that product release/service delivery is
‘to the customer’ has been added |
|
8.3
|
Para 1 |
The requirement for a
documented procedure has been re-worded but remains unchanged
|
|
Para 2 |
The phrase ‘where
applicable’ has been added to the methods for dealing with
nonconforming product |
|
d) |
New bullet, was
paragraph 4 concerning action to be taken after delivery has been
made. |
|
Paras 3&4 |
Content unchanged but
swapped. |
|
8.4 |
b) |
Change of reference to
8.2.4 |
|
c) |
Addition of reference to
8.2.3 & 8.2.4 |
|
d) |
Addition of reference to
7.4 |
|
8.5.2 |
Para 1 |
‘cause’ becomes ‘causes’ |
|
f) |
Insertion of ‘the
effectiveness of the’ to Corrective Action |
|
8.5.3 |
e) |
Insertion of ‘the
effectiveness of the’ to Preventive Action |
|
Annexes |
All |
Updated to show
ISO9OO1:2008 & ISO14001:2004 |